What do you draw when you are visualizing a project on a whiteboard?
I draw an arrow from left to right that represents a timeline. Not always. But many times.
The way you visualize, determines your focus.
I’ve been playing with the simple but powerful concept of a Project Story Circle.

The project is represented by a circular arrow and is divided in half with a horizontal line.
The idea behind it is the following:
- An organization has the need for something. A challenge has to be conquered. A group of people starts a journey and brings back their result to the organization.
- The upper half of the circle represents time spent outside the project. Preparing for the voyage. And getting the results back to the place where it is needed.
- The bottom half makes up for project time.
- This will focus attention on the transitions organization-project and project-organization.
- This will focus attention on the idea that you undertake the project long before the actual project starts and that it only ends when you have gone full circle; when the actual benefits are realized.
You can use this shape when discussing projects.
- Where do people join the journey? (indicate on the circle)
- In which parts are they active? (indicate on the circle)
- Where do they expect problems? (indicate on the circle)
This basic shape is inspired by The Hero’s Journey, the universal structure of myths. What makes this narrative structure so interesting is not that many movies are based upon it. It’s more the reason why so many stories are following this flow. There is a certain appeal to it, we all recognize parts of how we experience our own life story.
One essential part of the Hero’s Journey is the transformation the hero is going through. In the storyline there is a defining moment when the hero is experiencing a major set back where he is hitting a brick wall. And this wall will be the turning point. During the bottom half of the circle you can also bring in the concept of the red convertible:
“I think a project can have a “red convertible” moment. It’s that breakdown, or more that revelation, in which you remember why you were doing something in the first place. … This transition is the “red convertible”.”
Talking about transitions is important. Transitions reveal patterns. And antipatterns. It’s the moment when contrast is at its peak. When everything remains the same, we don’t notice our rhythms and boundaries that much. When all of a sudden everything is changing, we start to notice what felt natural before.
I think the Project Story Circle can assist you in discussing those transitions.
Great, Bas
I would add the transition state on the graph. Also, I would consider flipping the arrow so that the transition state would be at the top
Just fancy ideas, I know
I think this is a fascinating approach, because in general when discussing project timelines they focus on the customer much more than the business working on the project. Really, the aspects that apply to the business are ultimately the most important metrics for success.
Hey Bas again,
Talking about visualizing projects it is timely to mention that I published few hours ago a new concept of visualizing not only data, but text as well. The visualization allows for the monitoring of what seems on the surface distant and unrelated topics. In the presentation SNA of Blue Ocean Strategy I applied the concept of social network analysis (SNA) to study BOS. Amazingly, whether right or wrong I added a new dimension to BOS because of this visual approach
I am writing this because the same approach is extensible to projects and their visualization. Bas, you sketch well, but I do not. That is why I use the SNA to save me.
If interested, the link is
http://www.slideshare.net/hudali15/sna-of-blue-ocean-strategy
Hey Bas and Curt,
I want to add to the previous comment that I have expanded the presentation to compare Blue Ocean Strategy, Balanced Scorecard and team build up in one graph. This allows for avoidance of fragmented approaches. On Slide 19 I show the dynamics of the three managerial tools and the feedback among then using a social network analysis canvas.
I agree with Curt that we should avoid focusing on customers; an integrated and timely approach is far more rewarding.
Bas,
The circle makes sense from a super macro-point of view. I’d be interested to hear about how you use this with the folks you work with.
I’m working on a similar concept that I’d love some feedback on. I’m trying to use a simple graphic to show a project soup to nuts:
http://mikeyanderson.com/simple-project-management
Hey Mike, that is an awesome drawing. Captures the essence beautifully!
Interesting anologies. I also think that once the circle is partially completed, roll it out into a straight line, and see what insights are revealed? http://www.projectcoach.com.au also has a number of blogs on problem solving and team building